Following the growing trend for electric passenger cars, due to their lower environmental and climate impacts, a trend towards the electrification of public transport is emerging, particularly regarding urban buses. However, the reliability of the service offered by electric alternatives to diesel-powered buses and the costs of the related transition have not been fully explored. In this background, we simulated the transition to electric bus powertrains for two bus lines in Locarno (Southern Switzerland) and compared the currently available electric technologies and charging schemes, based on their level of operation and their overall cost. According to these simulations, "opportunity charging"schemes emerged as the most promising ones for such urban lines in Locarno. Nonetheless, in the short-Term their introduction is still hindered by barriers, such as in particular: The lack of capability to guarantee the service in case of delays above three minutes, the higher cost (between 40% and 60% higher than Euro VI diesel buses, which is also hampered by cashback on diesel custom duties), the need for proper training by the transport company staff, and the time needed to install the charging stations.

Simao, J., Cellina, F., Rudel, R. (2020). Critical barriers precluding the electrification of road public transport in Southern Switzerland. In 2020 15th International Conference on Ecological Vehicles and Renewable Energies, EVER 2020. Institute of Electrical and Electronics Engineers Inc. [10.1109/EVER48776.2020.9242949].

Critical barriers precluding the electrification of road public transport in Southern Switzerland

Cellina F.;
2020

Abstract

Following the growing trend for electric passenger cars, due to their lower environmental and climate impacts, a trend towards the electrification of public transport is emerging, particularly regarding urban buses. However, the reliability of the service offered by electric alternatives to diesel-powered buses and the costs of the related transition have not been fully explored. In this background, we simulated the transition to electric bus powertrains for two bus lines in Locarno (Southern Switzerland) and compared the currently available electric technologies and charging schemes, based on their level of operation and their overall cost. According to these simulations, "opportunity charging"schemes emerged as the most promising ones for such urban lines in Locarno. Nonetheless, in the short-Term their introduction is still hindered by barriers, such as in particular: The lack of capability to guarantee the service in case of delays above three minutes, the higher cost (between 40% and 60% higher than Euro VI diesel buses, which is also hampered by cashback on diesel custom duties), the need for proper training by the transport company staff, and the time needed to install the charging stations.
paper
barriers; electric buses; Eletrification of road public transport;
English
15th International Conference on Ecological Vehicles and Renewable Energies, EVER 2020 - 10-12 September 2020
2020
2020 15th International Conference on Ecological Vehicles and Renewable Energies, EVER 2020
9781728156415
2020
9242949
none
Simao, J., Cellina, F., Rudel, R. (2020). Critical barriers precluding the electrification of road public transport in Southern Switzerland. In 2020 15th International Conference on Ecological Vehicles and Renewable Energies, EVER 2020. Institute of Electrical and Electronics Engineers Inc. [10.1109/EVER48776.2020.9242949].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/530502
Citazioni
  • Scopus 3
  • ???jsp.display-item.citation.isi??? 2
Social impact