JET, the world's largest operating tokamak with unique Be/W wall and tritium handling capability, completed a Deuterium-Tritium (D-T) campaign in 2021 (Maggi et al 29th Fusion Energy Conf.) following a decade of preparatory experiments, dedicated enhancements, technical rehearsals and training (Horton et al 2016 Fusion Eng. Des. 109-111 925). Operation with tritium raises significant technical, safety and scientific challenges not encountered in standard protium or deuterium operation. This contribution describes the tritium operational requirements, pulses and technical preparations, new operating procedures, lessons learned and details on the achieved operational availability and performance. The preparation and execution of the recent JET tritium experiments benefitted from the previous experience in 1991 (Preliminary Tritium Experiment), 1997 (DTE1 campaign) and 2003 (Trace Tritium Campaigns) and consisted of the following five phases: technical rehearsals and scenario preparation, tritium commissioning, 100% tritium campaign, D-T campaign (DTE2), tritium clean-up. Following the clean-up JET resumed normal operation and is currently undertaking a further D-T campaign (DTE3).

King, D., Abdelrahman, E., Abdul Hamid, A., Abid, N., Abraham, K., Adabonyan, O., et al. (2024). JET machine operations in T&D-T. NUCLEAR FUSION, 64(10) [10.1088/1741-4326/ad6ce5].

JET machine operations in T&D-T

Dal Molin A.;
2024

Abstract

JET, the world's largest operating tokamak with unique Be/W wall and tritium handling capability, completed a Deuterium-Tritium (D-T) campaign in 2021 (Maggi et al 29th Fusion Energy Conf.) following a decade of preparatory experiments, dedicated enhancements, technical rehearsals and training (Horton et al 2016 Fusion Eng. Des. 109-111 925). Operation with tritium raises significant technical, safety and scientific challenges not encountered in standard protium or deuterium operation. This contribution describes the tritium operational requirements, pulses and technical preparations, new operating procedures, lessons learned and details on the achieved operational availability and performance. The preparation and execution of the recent JET tritium experiments benefitted from the previous experience in 1991 (Preliminary Tritium Experiment), 1997 (DTE1 campaign) and 2003 (Trace Tritium Campaigns) and consisted of the following five phases: technical rehearsals and scenario preparation, tritium commissioning, 100% tritium campaign, D-T campaign (DTE2), tritium clean-up. Following the clean-up JET resumed normal operation and is currently undertaking a further D-T campaign (DTE3).
Articolo in rivista - Articolo scientifico
JET; operations; tritium;
English
22-ago-2024
2024
64
10
106014
none
King, D., Abdelrahman, E., Abdul Hamid, A., Abid, N., Abraham, K., Adabonyan, O., et al. (2024). JET machine operations in T&D-T. NUCLEAR FUSION, 64(10) [10.1088/1741-4326/ad6ce5].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/528501
Citazioni
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 0
Social impact