An overview is presented of the progress since 2021 in the construction and scientific programme preparation of the Divertor Tokamak Test (DTT) facility. Licensing for building construction has been granted at the end of 2021. Licensing for Cat. A radiologic source has been also granted in 2022. The construction of the toroidal field magnet system is progressing. The prototype of the 170 GHz gyrotron has been produced and it is now under test on the FALCON facility. The design of the vacuum vessel, the poloidal field coils and the civil infrastructures has been completed. The shape of the first DTT divertor has been agreed with EUROfusion to test different plasma and exhaust scenarios: single null, double null, X-divertor and negative triangularity plasmas. A detailed research plan is being elaborated with the involvement of the EUROfusion laboratories.

Romanelli, F., Abate, D., Acampora, E., Agguiaro, D., Agnello, R., Agostinetti, P., et al. (2024). Divertor Tokamak Test facility project: status of design and implementation. NUCLEAR FUSION, 64(11) [10.1088/1741-4326/ad5740].

Divertor Tokamak Test facility project: status of design and implementation

Aucone L.;Bin W.;Bonanomi N.;Calvo G.;Casiraghi I.;
2024

Abstract

An overview is presented of the progress since 2021 in the construction and scientific programme preparation of the Divertor Tokamak Test (DTT) facility. Licensing for building construction has been granted at the end of 2021. Licensing for Cat. A radiologic source has been also granted in 2022. The construction of the toroidal field magnet system is progressing. The prototype of the 170 GHz gyrotron has been produced and it is now under test on the FALCON facility. The design of the vacuum vessel, the poloidal field coils and the civil infrastructures has been completed. The shape of the first DTT divertor has been agreed with EUROfusion to test different plasma and exhaust scenarios: single null, double null, X-divertor and negative triangularity plasmas. A detailed research plan is being elaborated with the involvement of the EUROfusion laboratories.
Articolo in rivista - Articolo scientifico
divertor; exhaust; plasma scenarios;
English
11-set-2024
2024
64
11
112015
none
Romanelli, F., Abate, D., Acampora, E., Agguiaro, D., Agnello, R., Agostinetti, P., et al. (2024). Divertor Tokamak Test facility project: status of design and implementation. NUCLEAR FUSION, 64(11) [10.1088/1741-4326/ad5740].
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/518741
Citazioni
  • Scopus 1
  • ???jsp.display-item.citation.isi??? 1
Social impact