We present on the status of POLARBEAR-2 A (PB2-A) focal plane fabrication. The PB2-A is the first of three telescopes in the Simons Array, which is an array of three cosmic microwave background polarization-sensitive telescopes located at the POLARBEAR site in Northern Chile. As the successor to the PB experiment, each telescope and receiver combination is named as PB2-A, PB2-B, and PB2-C. PB2-A and -B will have nearly identical receivers operating at 90 and 150 GHz while PB2-C will house a receiver operating at 220 and 270 GHz. Each receiver contains a focal plane consisting of seven close-hex packed lenslet-coupled sinuous antenna transition edge sensor bolometer arrays. Each array contains 271 dichroic optical pixels, each of which has four TES bolometers for a total of 7588 detectors per receiver. We have produced a set of two types of candidate arrays for PB2-A. The first we call Version 11 (V11) uses a silicon oxide (SiOx) for the transmission lines and crossover process for orthogonal polarizations. The second we call Version 13 (V13) uses silicon nitride (SiNx) for the transmission lines and cross-under process for orthogonal polarizations. We have produced enough of each type of array to fully populate the focal plane of the PB2-A receiver. The average wirebond yield for V11 and V13 arrays is 93.2% and 95.6%, respectively. The V11 arrays had a superconducting transition temperature (Tc) of 452±15 mK, a normal resistance (Rn) of 1.25±0.20Ω, and saturation powers of 5.2 ± 1.0 pW and 13 ± 1.2 pW for the 90 and 150 GHz bands, respectively. The V13 arrays had a superconducting transition temperature (Tc) of 456 ± 6 mK, a normal resistance (Rn) of 1.1±0.2Ω, and saturation powers of 10.8 ± 1.8 pW and 22.9 ± 2.6 pW for the 90 and 150 GHz bands, respectively. Production and characterization of arrays for PB2-B are ongoing and are expected to be completed by the summer of 2018. We have fabricated the first three candidate arrays for PB2-C but do not have any characterization results to present at this time.
Westbrook, B., Ade, P., Aguilar, M., Akiba, Y., Arnold, K., Baccigalupi, C., et al. (2018). The POLARBEAR-2 and Simons Array Focal Plane Fabrication Status. JOURNAL OF LOW TEMPERATURE PHYSICS, 193(5-6), 758-770 [10.1007/s10909-018-2059-0].
The POLARBEAR-2 and Simons Array Focal Plane Fabrication Status
Coppi G.;Poletti D.;Suzuki A.;
2018
Abstract
We present on the status of POLARBEAR-2 A (PB2-A) focal plane fabrication. The PB2-A is the first of three telescopes in the Simons Array, which is an array of three cosmic microwave background polarization-sensitive telescopes located at the POLARBEAR site in Northern Chile. As the successor to the PB experiment, each telescope and receiver combination is named as PB2-A, PB2-B, and PB2-C. PB2-A and -B will have nearly identical receivers operating at 90 and 150 GHz while PB2-C will house a receiver operating at 220 and 270 GHz. Each receiver contains a focal plane consisting of seven close-hex packed lenslet-coupled sinuous antenna transition edge sensor bolometer arrays. Each array contains 271 dichroic optical pixels, each of which has four TES bolometers for a total of 7588 detectors per receiver. We have produced a set of two types of candidate arrays for PB2-A. The first we call Version 11 (V11) uses a silicon oxide (SiOx) for the transmission lines and crossover process for orthogonal polarizations. The second we call Version 13 (V13) uses silicon nitride (SiNx) for the transmission lines and cross-under process for orthogonal polarizations. We have produced enough of each type of array to fully populate the focal plane of the PB2-A receiver. The average wirebond yield for V11 and V13 arrays is 93.2% and 95.6%, respectively. The V11 arrays had a superconducting transition temperature (Tc) of 452±15 mK, a normal resistance (Rn) of 1.25±0.20Ω, and saturation powers of 5.2 ± 1.0 pW and 13 ± 1.2 pW for the 90 and 150 GHz bands, respectively. The V13 arrays had a superconducting transition temperature (Tc) of 456 ± 6 mK, a normal resistance (Rn) of 1.1±0.2Ω, and saturation powers of 10.8 ± 1.8 pW and 22.9 ± 2.6 pW for the 90 and 150 GHz bands, respectively. Production and characterization of arrays for PB2-B are ongoing and are expected to be completed by the summer of 2018. We have fabricated the first three candidate arrays for PB2-C but do not have any characterization results to present at this time.I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.