We explore the Monte Carlo steps required to reduce the sampling error of the estimated 99.9% quantile within an acceptable threshold. Our research is of primary interest to practitioners working in the area of operational risk measurement, where the annual loss distribution cannot be analytically determined in advance. Usually, the frequency and the severity distributions should be adequately combined and elaborated with Monte Carlo methods, in order to estimate the loss distributions and risk measures. Naturally, financial analysts and regulators are interested in mitigating sampling errors, as prescribed in EU Regulation 2018/959. In particular, the sampling error of the 99.9% quantile is of paramount importance, along the lines of EU Regulation 575/2013. The Monte Carlo error for the operational risk measure is here assessed on the basis of the binomial distribution. Our approach is then applied to realistic simulated data, yielding a comparable precision of the estimate with a much lower computational effort, when compared to bootstrap, Monte Carlo repetition, and two other methods based on numerical optimization
Greselin, F., Piacenza, F., Zitikis, R. (2019). Practice Oriented and Monte Carlo Based Estimation of the Value-at-Risk for Operational Risk Measurement. RISKS, 7(2), 1-20 [10.3390/risks7020050].
Practice Oriented and Monte Carlo Based Estimation of the Value-at-Risk for Operational Risk Measurement
Greselin, F;
2019
Abstract
We explore the Monte Carlo steps required to reduce the sampling error of the estimated 99.9% quantile within an acceptable threshold. Our research is of primary interest to practitioners working in the area of operational risk measurement, where the annual loss distribution cannot be analytically determined in advance. Usually, the frequency and the severity distributions should be adequately combined and elaborated with Monte Carlo methods, in order to estimate the loss distributions and risk measures. Naturally, financial analysts and regulators are interested in mitigating sampling errors, as prescribed in EU Regulation 2018/959. In particular, the sampling error of the 99.9% quantile is of paramount importance, along the lines of EU Regulation 575/2013. The Monte Carlo error for the operational risk measure is here assessed on the basis of the binomial distribution. Our approach is then applied to realistic simulated data, yielding a comparable precision of the estimate with a much lower computational effort, when compared to bootstrap, Monte Carlo repetition, and two other methods based on numerical optimizationFile | Dimensione | Formato | |
---|---|---|---|
GPZ Risks Practice Oriented and Monte Carlo Based Estimation of the Value-at-Risk for Operational Risk Measurement.pdf
accesso aperto
Tipologia di allegato:
Publisher’s Version (Version of Record, VoR)
Dimensione
543.39 kB
Formato
Adobe PDF
|
543.39 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.