SPIDER is one of two projects of the ITER Neutral Beam Test Facility under construction in Padova, Italy, at the Consorzio RFX premises. It will have a 100 keV beam source with a full-size prototype of the radiofrequency ion source for the ITER neutral beam injector (NBI) and also, similar to the ITER diagnostic neutral beam, it is designed to operate with a pulse length of up to 3600 s, featuring an ITER-like magnetic filter field configuration (for high extraction of negative ions) and caesium oven (for high production of negative ions) layout as well as a wide set of diagnostics. These features will allow a reproduction of the ion source operation in ITER, which cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission of achieving the ITER heating and diagnostic NBI ion source requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations - integration and testing of SPIDER components, completion and implementation of diagnostics and control and formulation of operation and research plan, based on a staged strategy

Toigo, V., Dal Bello, S., Gaio, E., Luchetta, A., Pasqualotto, R., Zaccaria, P., et al. (2017). The ITER Neutral Beam Test Facility towards SPIDER operation. NUCLEAR FUSION, 57(8) [10.1088/1741-4326/aa7490].

The ITER Neutral Beam Test Facility towards SPIDER operation

CROCI, GABRIELE;GORINI, GIUSEPPE;REBAI, MARICA;MURARO, ANDREA;TARDOCCHI, MARCO
Penultimo
;
2017

Abstract

SPIDER is one of two projects of the ITER Neutral Beam Test Facility under construction in Padova, Italy, at the Consorzio RFX premises. It will have a 100 keV beam source with a full-size prototype of the radiofrequency ion source for the ITER neutral beam injector (NBI) and also, similar to the ITER diagnostic neutral beam, it is designed to operate with a pulse length of up to 3600 s, featuring an ITER-like magnetic filter field configuration (for high extraction of negative ions) and caesium oven (for high production of negative ions) layout as well as a wide set of diagnostics. These features will allow a reproduction of the ion source operation in ITER, which cannot be done in any other existing test facility. SPIDER realization is well advanced and the first operation is expected at the beginning of 2018, with the mission of achieving the ITER heating and diagnostic NBI ion source requirements and of improving its performance in terms of reliability and availability. This paper mainly focuses on the preparation of the first SPIDER operations - integration and testing of SPIDER components, completion and implementation of diagnostics and control and formulation of operation and research plan, based on a staged strategy
Articolo in rivista - Articolo scientifico
heating neutral beam injector (HNB); ITER; PRIMA: the ITER Neutral Beam Test Facility (NBTF); SPIDER; Nuclear and High Energy Physics; Condensed Matter Physics
English
2017
57
8
086027
reserved
Toigo, V., Dal Bello, S., Gaio, E., Luchetta, A., Pasqualotto, R., Zaccaria, P., et al. (2017). The ITER Neutral Beam Test Facility towards SPIDER operation. NUCLEAR FUSION, 57(8) [10.1088/1741-4326/aa7490].
File in questo prodotto:
File Dimensione Formato  
NuclFusion-PRIMAtowardsSPIDEROperation.pdf

Solo gestori archivio

Tipologia di allegato: Publisher’s Version (Version of Record, VoR)
Dimensione 2.45 MB
Formato Adobe PDF
2.45 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10281/173892
Citazioni
  • Scopus 45
  • ???jsp.display-item.citation.isi??? 45
Social impact